Planning home automation in a renovation

Start a conversation

The best time to plan home automation is before the builder starts. This guide explains what to decide at each stage, so cabling goes in at the right moment and nothing has to be undone.

Entrance hall with a wall control panel and door lock

1. Start with how you live

Before talking about equipment, think about the rooms. Where do you want music? Which rooms need to go dark for films? Where would one button to turn everything off be useful? Which doors and gates do visitors use?

Those answers shape everything else, and they are much easier to discuss with a floor plan in front of you.

2. Design before first fix

First fix is when the electrician runs cables and fits back boxes, before plastering. Home automation needs its own cables for keypads, speakers, access points, cameras and screens, so the design must be ready before this stage.

A good design includes a cable schedule for every room and a location for the equipment rack, with power and ventilation.

  • Lighting circuits grouped for scenes, not just switches.
  • Keypad positions agreed on the elevations.
  • Speaker and screen positions set against the ceiling plan and joinery.
  • Wired access points for Wi-Fi in every part of the house.
  • A ventilated cupboard or plant room for the rack.

3. Coordinate with the interior

If you are also working on the interior, the two designs should be developed together. A wall light that moves, a joinery unit that grows or a ceiling detail that changes can all affect cabling. Keeping the drawings in step avoids late surprises.

4. Commissioning and handover

Once decorators have finished, the system is installed, programmed and tested. Scenes are best set in the finished rooms, with the furniture in place. Then the household is shown how everything works.

Expect to fine-tune things in the first few weeks of living in the house. That is normal, and a good installer will plan for it.

Questions we are asked

What if the builder has already started?

It is rarely too late to plan something useful. The key point is second fix: once walls are plastered, options narrow, so get advice as soon as possible.

Can wireless systems avoid the need for cabling?

Wireless control is excellent for finished homes, but speakers, access points and cameras still need cables, so planning them during a renovation pays off.